Penerapan Metode Lean Six Sigma untuk Meningkatkan Keakuratan Jadwal Perawatan Pesawat CN-295M di Skadron Teknik 021
(1) Manajemen Transportasi, Institut Transportasi dan Logistik Trisakti, Indonesia
(2) Universitas Sahid Jakarta, Indonesia
(3) Manajemen Transportasi, Institut Transportasi dan Logistik Trisakti, Indonesia
(4) Institut Transportasi dan Logistik Trisakti
(*) Corresponding Author
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Cheung, A. I. W. H., & Lu, D. (2005). Expert system for aircraft maintenance services industry. Journal of Quality in Maintenance Engineering, 11(4), 348–358. https://doi.org/10.1108/13552510510626972
D’Apice, C., De Nicola, C., Manzo, R., & Moccia, V. (2014). Optimal scheduling for aircraft departures. Journal of Ambient Intelligence and Humanized Computing, 5(6), 799-807. https://doi.org/10.1007/s12652-014-0223-1
Díaz-Ramírez, J., Huertas, J. I., & Trigos, F. (2014). Aircraft maintenance, routing, and crew scheduling planning for airlines with a single fleet and a single maintenance and crew base. Computers & Industrial Engineering, 75, 68-78. https://doi.org/10.1016/j.cie.2014.05.027
Gede, B. N., Karningsih, P. D., & Supriyanto, H. H. (2012). Implementasi Konsep Lean pada Aktivitas. Jurnal Teknik ITS, 1, 460–464.
Handika, F. S., & B. Barnadi, A. (2017). Analisis Pemakaian Listrik pada Pompa Drainage Unit dengan Menggunakan New Quality Tools. Jurnal Sistem Dan Manajemen Industri, 1(2), 91. https://doi.org/10.30656/jsmi.v1i2.477
Junqueira, V. S. ., Nagano, M. S., & Miyata, H. H. (2018). Procedure structuring for programming aircraft maintenance activities. Revista de Gestão, 27(1), 2–20. https://doi.org/10.1108/REGE-02-2018-0026
Kholil, M., & Pambudi, T. (2014). Implementasi Lean Six Sigma Dalam Peningkatan Kualitas Dengan Mengurangi Produk Cacat NG Drop di Mesin Final Test Produk HL 4.8 di PT SSI. Jurnal Pasti, 8(1), 182844.
Pande, P. S. (2003). The Six Sigma Way. Penerbit Andi.
Pradnyandari, T. S., Satya, & Purnawati, N. K. (2019). Peran Maintenance Dalam Memoderasi Pengaruh Scheduling Terhadap Kinerja Maskapai Penerbangan. Bali: E-Jurnal Manajemen, 8(6).
Saltoğlu, R., Humaira, N., & İnalhan, G. (2016). Aircraft Scheduled Airframe Maintenance and Downtime Integrated Cost Model. Advances in Operations Research. https://doi.org/10.1155/2016/2576825
Samaranayake, P. (2006). Current practices and problem areas in aircraft maintenance planning and scheduling–interfaced/integrated system perspective, UWS, Sidney (pp. 2245-2256). INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, Proceedings of the 7th Asia-Pacific Conference in Bangkok, UWS, Sidney (Pp. 2245-2256).
Samaranayake, P., & Kiridena, S. (2012). Aircraft maintenance planning and scheduling: an integrated framework. Journal of Quality in Maintenance Engineering, 18(4), 432–453. https://doi.org/10.1108/13552511211281598
Semaan, N. M., & Yehia, N. (2019). A stochastic detailed scheduling model for periodic maintenance of military rotorcraft. Aircraft Engineering and Aerospace Technology, 91(9), 1195–1204. https://doi.org/10.1108/AEAT-09-2018-0254
Stergianos, C., Atkin, J. A. D., Schittekat, P., Nordlander, T. E., Gerada, C., & Morvan, H. (2015). Pushback delays on the routing and scheduling problem of aircraft. Lecture Notes in Management Science (Vol. 7, Pp. 34-40).
DOI: http://dx.doi.org/10.25104/wa.v47i1.411.51-66
Article metrics
Abstract views : 567 | views : 450Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
WARTAARDHIA Indexed by:
Copyright of Warta Ardhia (e-ISSN:2528-4045, p-ISSN:0215-9066) Sekretariat Jurnal Transportasi Udara, Jl. Medan Merdeka Timur No. 5 A Jakarta Pusat 10110. Tlp. (021) 34832944, Fax. (021) 34832968. Email:litbang_udara@yahoo.co.id; warta.ardhia@gmail.com.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.